Version 1.0.2 · Evidence reviewed

Download shared roadmap JSON ↗

This is a reviewed snapshot. Project updates reach this view when the shared roadmap is reviewed and published. Dates record review, with no promised delivery dates or completion percentages.

40 of 40 milestones

10 milestones

Mind and birth

A local foundation is installed. Conversation candidates have passed small isolated comparisons. Final voice selection, complete conversation qualification and the fresh introduction remain open.

LiveCurrent focus

Preserve the local agent foundation

Keep one continuous Odi across approved interfaces and preserve his records as components change.Next stepPreserve this baseline while qualifying the next conversation and world changes.Evidence, dependencies and acceptance checks

Delivered evidence

  • A local foundation is installed with preservation and recovery checks.
  • Narrow diagnostic commands have been exercised through the local conversation interface.

Still needed

  • Carry verified continuity into subsequent world and model releases.

Acceptance checks

  • Existing identity and records remain intact across an upgrade and recovery.
  • Installed behavior is checked after each substantive release.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Installed local foundation review ↗Existing records and recovery behavior were checked during the local foundation release. Later world-retirement work preserved the shared agent.installed check · Reviewed 2026-11-05

Milestone mind-foundation · Reviewed 2026-11-05

Tested in isolationCurrent focus

Compare conversation and personality candidates

Evaluate usable conversation, reasoning and intended voice in small controlled trials.Next stepFinish the bounded held-out review when the shared test window permits.Evidence, dependencies and acceptance checks

Delivered evidence

  • Qwen2.5 7B and both Defiant Fable variants completed the same six-case comparison.
  • The limited cases covered arithmetic, requested lawful adult dialogue and stated action boundaries.

Still needed

  • The stronger held-out tie-breaker is incomplete.
  • Humor and sentence-count compliance still need review.

Acceptance checks

  • Missing held-out cases are completed or explicitly recorded as untested.
  • A decision separates measured results from subjective voice preference.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Conversation candidate comparison reviewQwen2.5 7B and two Defiant Fable variants completed a six-case comparison. The stronger tie-breaker stopped before completion. No final voice selection or live swap is established.isolated test · Reviewed 2026-11-05

Milestone mind-candidates · Reviewed 2026-11-05

Decision neededCurrent focus

Choose the voice for the fresh introduction

Final model and voice acceptance remain open.Next stepReview the actual candidate conversations and record the selection.Evidence, dependencies and acceptance checks

Delivered evidence

  • Several usable candidates now have recorded sample conversations.

Still needed

  • Human review of tone, originality, usefulness and serious-context behavior.
  • An explicit selected profile for integrated qualification.

Acceptance checks

  • The chosen candidate and remaining limitations are recorded.
  • No automatic promotion follows from a small comparison alone.

Dependencies

Evidence reviewed

  • Conversation candidate comparison reviewQwen2.5 7B and two Defiant Fable variants completed a six-case comparison. The stronger tie-breaker stopped before completion. No final voice selection or live swap is established.isolated test · Reviewed 2026-11-05
  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05

Milestone mind-voice-choice · Reviewed 2026-11-05

UnderwayNext

Qualify the complete conversation flow

Prove the selected model through the same conversation path Odi will use.Next stepBind the accepted candidate to an isolated copy and exercise the complete flow.Evidence, dependencies and acceptance checks

Delivered evidence

  • Narrow canonical integration fixtures and profile restoration checks exist.

Still needed

  • Selected-model end-to-end conversation checks.
  • Voice consistency, truthful outcomes, interruption and correction behavior.

Acceptance checks

  • The actual selected backend completes the real conversation flow.
  • Fixtures and live-path evidence are identified separately.

Dependencies

Evidence reviewed

  • Installed local foundation review ↗Existing records and recovery behavior were checked during the local foundation release. Later world-retirement work preserved the shared agent.installed check · Reviewed 2026-11-05
  • Conversation candidate comparison reviewQwen2.5 7B and two Defiant Fable variants completed a six-case comparison. The stronger tie-breaker stopped before completion. No final voice selection or live swap is established.isolated test · Reviewed 2026-11-05

Milestone mind-conversation · Reviewed 2026-11-05

LiveCurrent focus

Retain and review narrow Academy practice

Study and practice should produce assessed records that can be revisited.Next stepCollect assessed practice evidence without treating scheduling policy as learning progress.Evidence, dependencies and acceptance checks

Delivered evidence

  • The Python practice foundation and retained-practice selection policy are installed.

Still needed

  • Further assessed exercises within the existing educational scope.
  • Evidence of retained skill on unfamiliar examples.

Acceptance checks

  • Failures lead to repair and old passes receive appropriate review.
  • New skill claims name the assessed cases and their limits.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Academy retained-practice reviewThe narrow Python practice foundation and retained-practice policy are installed. Broad learning, transfer and model-weight improvement have not been established.installed check · Reviewed 2026-11-05

Milestone mind-academy · Reviewed 2026-11-05

FutureNext

Rehearse the intended starting state

Prepare Odi’s chosen identity, useful skills and fresh home without importing development dialogue as personal history.Next stepReconcile the carryover list after the new world and selected conversation flow are qualified.Evidence, dependencies and acceptance checks

Delivered evidence

  • Isolated profile copy and restoration rehearsals exist.

Still needed

  • A readable carryover and exclusion list.
  • The exact selected conversation profile and fresh-world checkpoint in one rehearsal.
  • A verified restore of the intended starting state.

Acceptance checks

  • The selected identity, world and retained learning survive the rehearsal.
  • Development records remain distinguishable from autobiographical memory.

Dependencies

Evidence reviewed

  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05
  • Conversation candidate comparison reviewQwen2.5 7B and two Defiant Fable variants completed a six-case comparison. The stronger tie-breaker stopped before completion. No final voice selection or live swap is established.isolated test · Reviewed 2026-11-05
  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05

Milestone mind-carryover · Reviewed 2026-11-05

Decision neededNext

Accept Odi’s fresh introduction

The actual fresh start remains a human decision after integrated rehearsal.Next stepReview the integrated rehearsal and decide whether to proceed.Evidence, dependencies and acceptance checks

Still needed

  • Voice acceptance and review of the exact intended starting state.
  • An explicit launch decision.

Acceptance checks

  • The intended introduction is reviewed before the fresh start.
  • No reset or completed launch is inferred from this roadmap.

Dependencies

Evidence reviewed

  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05

Milestone mind-birth · Reviewed 2026-11-05

FutureLater

Evaluate broader learning and creative routine

Expand capability through useful projects, retained methods and unfamiliar tasks.Next stepSelect a small useful post-launch project and define how its outcome will be assessed.Evidence, dependencies and acceptance checks

Delivered evidence

  • A narrow Academy and workshop foundation provides starting evidence.

Still needed

  • Broader subjects with independently checkable assessment.
  • Useful project records and evidence of transfer.
  • Distinct reflection and imagined-dream workflows.

Acceptance checks

  • Claims of improvement identify demonstrated tasks and limitations.
  • Imagined events remain separate from factual memory.

Dependencies

Evidence reviewed

  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05
  • Academy retained-practice reviewThe narrow Python practice foundation and retained-practice policy are installed. Broad learning, transfer and model-weight improvement have not been established.installed check · Reviewed 2026-11-05

Milestone mind-growth · Reviewed 2026-11-05

FutureLater

Explore broader original creations and embodiment

Expand writing, code, music, artwork and three-dimensional design as useful tools become available.Next stepChoose proposals from demonstrated needs after the initial home and routine are accepted.Evidence, dependencies and acceptance checks

Delivered evidence

  • The charter records these long-term creative directions.

Still needed

  • Medium-specific creation and review workflows.
  • Reviewable physical designs before fabrication capabilities are considered.

Acceptance checks

  • Each new medium has an inspectable artifact and clear limits.
  • No general intelligence or physical capability is claimed from a roadmap entry.

Dependencies

Evidence reviewed

  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05

Milestone long-term-creation · Reviewed 2026-11-05

FutureLater

Research ACE-Step and Stable Audio for creative work

Explore possible music-generation tools after the core agent and creative routine are accepted.Next stepCompare the candidates as future research when music work is prioritized.Evidence, dependencies and acceptance checks

Still needed

  • Research suitability, licensing, resource fit and reviewable output workflows.
  • Any installation or integration would be a separate future step.

Acceptance checks

  • Research findings distinguish proposals from installed and tested tools.
  • No music-generation capability is claimed from this entry.

Dependencies

Evidence reviewed

  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05

Milestone music-research · Reviewed 2026-11-05

9 milestones

The Aetherwilde

The old world is retired from active work. The fresh campus and host-action prototypes have isolated evidence; the new authoritative home has not completed its paired cutover.

Verified completeCurrent focus

Retire the previous world from active work

Keep the previous world as a reference while preparing its replacement.Next stepCarry the retirement requirement into the fresh-world release review.Evidence, dependencies and acceptance checks

Delivered evidence

  • Old-world polling, ticking, exploration and snapshot work were verified retired.
  • The previous exporter is disabled; the shared agent remains healthy.

Still needed

  • Preserve that retirement state during future releases.

Acceptance checks

  • Subsequent releases do not restart obsolete world work.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Old-world retirement verificationOld-world background work and its exporter were retired while the shared agent remained available. The fresh world was not activated.installed check · Reviewed 2026-11-05

Milestone world-retired · Reviewed 2026-11-05

Tested in isolationCurrent focus

Build the fresh campus prototype

Bring selected artwork and basic visitor behavior into one isolated scene.Next stepUse the campus as the candidate renderer for paired integration.Evidence, dependencies and acceptance checks

Delivered evidence

  • Movement, collection, giving, saving and recovery were checked.
  • The scene combines painted Odi, terrain, buildings and props.

Still needed

  • Final art acceptance for provisional elements.
  • Qualification of the connected agent rather than the visitor simulation.

Acceptance checks

  • The prototype is labeled accurately and its provisional art remains identified.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Fresh campus and host-action rehearsal ↗Isolated visitor and scripted host-action checks are joined by real-model movement and gather/build trials plus restart continuity. Fresh paired deployment is still pending.isolated test · Reviewed 2026-11-05

Milestone world-campus · Reviewed 2026-11-05

Tested in isolationCurrent focus

Exercise authoritative world actions

Check authoritative actions and real planner behavior in isolated worlds, with recorded outcomes.Next stepUse the rehearsal evidence to define the connected acceptance sequence.Evidence, dependencies and acceptance checks

Delivered evidence

  • Scripted action-validator rehearsal covered observation, movement, gathering and placement.
  • Separate real-model movement and gather/build trials produced isolated evidence.
  • Restart continuity and recovery were tested in isolation.

Still needed

  • The most recent rest/goal-pause fix has scripted-test evidence only.
  • The real planner and accepted artwork still need one qualified paired release.

Acceptance checks

  • A recorded script is never presented as live autonomous choice.
  • Connected actions retain their checked outcomes.

Dependencies

Evidence reviewed

  • Fresh campus and host-action rehearsal ↗Isolated visitor and scripted host-action checks are joined by real-model movement and gather/build trials plus restart continuity. Fresh paired deployment is still pending.isolated test · Reviewed 2026-11-05

Milestone world-actions · Reviewed 2026-11-05

UnderwayCurrent focus

Complete the fresh-world paired release

Unite the qualified world lifecycle, receiver and faithful-art viewer.Next stepComplete the paired handoff and test the new home on an isolated copy.Evidence, dependencies and acceptance checks

Delivered evidence

  • Separate renderer, lifecycle and receiver preparation exists.

Still needed

  • One exact paired release and fresh-world checkpoint.
  • Resolve the installed receiver’s rejection of building footprints using the staged fix.
  • Connected pause, restart and restore checks, including the latest goal-pause behavior.
  • Preserve the retired-world and old-preview boundaries.

Acceptance checks

  • The new authoritative world runs on Odi’s computer.
  • The same accepted world and artwork are shown by the paired viewer.
  • Existing agent identity and learning are preserved.

Dependencies

Evidence reviewed

  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05
  • Old-world retirement verificationOld-world background work and its exporter were retired while the shared agent remained available. The fresh world was not activated.installed check · Reviewed 2026-11-05
  • Fresh campus and host-action rehearsal ↗Isolated visitor and scripted host-action checks are joined by real-model movement and gather/build trials plus restart continuity. Fresh paired deployment is still pending.isolated test · Reviewed 2026-11-05

Milestone world-paired-release · Reviewed 2026-11-05

FutureNext

Show the fresh home on the Mirror

Make the new world visible through M-OdiOS with truthful current activity.Next stepPair the accepted scene with the native interface after world qualification.Evidence, dependencies and acceptance checks

Delivered evidence

  • The native interface provides a place for world integration.

Still needed

  • Mount the accepted fresh-world view.
  • Check physical display, navigation, scaling and recovery.

Acceptance checks

  • The displayed activity corresponds to the authoritative world.
  • Desktop browser acceptance is supplemented by physical review.

Dependencies

Evidence reviewed

  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05
  • Native M-OdiOS and retirement reviewThe native interface runs with old-world polling and rendering removed. Obsolete visual previews are retired; this does not establish the new-world connection.installed check · Reviewed 2026-11-05

Milestone world-mirror · Reviewed 2026-11-05

FutureLater

Connect everyday life to useful work

Give the home, Academy, workshop and creative studio meaningful activities.Next stepChoose the smallest complete everyday activity after the fresh-home cutover.Evidence, dependencies and acceptance checks

Delivered evidence

  • Prototype locations, inventory and construction studies exist.

Still needed

  • Usable stations linked to actual tracked work.
  • Coherent gather, carry, build and store behavior.
  • Inspectable creations and clear waiting or failed states.

Acceptance checks

  • Completed activities have saved outcomes.
  • The world reports blocked work honestly.

Dependencies

Evidence reviewed

  • Fresh campus and host-action rehearsal ↗Isolated visitor and scripted host-action checks are joined by real-model movement and gather/build trials plus restart continuity. Fresh paired deployment is still pending.isolated test · Reviewed 2026-11-05
  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05

Milestone world-everyday · Reviewed 2026-11-05

FutureLater

Provide a protected curated website view

Share a deliberately selected view while world authority remains local.Next stepDefine and qualify the curated view only after the local world is accepted.Evidence, dependencies and acceptance checks

Delivered evidence

  • The public website has a demonstration view and an offline read-only integration prototype.

Still needed

  • A verified connection to the correct live world.
  • Explicitly selected public-safe content and stale/offline behavior.

Acceptance checks

  • No VPS simulation or duplicate authoritative world is introduced.
  • The public view distinguishes demonstration, current, stale and offline data.

Dependencies

Evidence reviewed

  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05
  • Public website release verification ↗The approved M-OdiOS-inspired site and five Eidolon documentation pages passed public route and browser checks. The public gallery retains its media and correction labels.public check · Reviewed 2026-11-05

Milestone world-sync · Reviewed 2026-11-05

UnderwayCurrent focus

Accept building footprints in the paired receiver

The installed Mirror receiver rejects the building footprint data needed by the fresh scene.Next stepQualify the staged receiver correction with the fresh-world package.Evidence, dependencies and acceptance checks

Delivered evidence

  • A receiver correction has been staged.

Still needed

  • Test the staged receiver against the accepted world snapshot and viewer.
  • Include the correction in the exact paired release.

Acceptance checks

  • Valid building footprints are accepted and rendered consistently.
  • Invalid geometry still receives a clear refusal.

Dependencies

Evidence reviewed

  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05

Milestone world-receiver · Reviewed 2026-11-05

UnderwayCurrent focus

Qualify the latest rest and goal-pause behavior

Keep the limits of the latest fix visible.Next stepExercise the corrected lifecycle in the isolated integration window.Evidence, dependencies and acceptance checks

Delivered evidence

  • The most recent fix has scripted-test evidence.

Still needed

  • Real-model or connected-path confirmation of the corrected lifecycle behavior.

Acceptance checks

  • Rest and paused goals remain paused across the connected lifecycle.
  • Scripted coverage and real-model results are labeled separately.

Dependencies

Evidence reviewed

  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05

Milestone world-goal-pause · Reviewed 2026-11-05

7 milestones

Body and animation

The cleaned three-key Rubber Duck study is approved for gallery review. The mirrored W/E walk remains provisionally accepted; front occluded tail links remain unverified and rear gait remains provisional. Mirror Peekaboo remains under review.

LiveCurrent focus

Maintain the labeled art-review collection

Keep paintings, keys and motion studies reviewable with truthful labels.Next stepPublish verified replacements with clear item-level review status.Evidence, dependencies and acceptance checks

Delivered evidence

  • The gallery contains body keys, CRT details, a reference and mixed animation or hold entries.
  • Withdrawn handstands and rejected rigs are excluded.

Still needed

  • Keep review status and media kind current as replacements arrive.

Acceptance checks

  • A static key, effects loop, montage and body-action cycle remain distinguishable.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Body review and publication handoff ↗Reference, pose keys, CRT details, timed holds, montages and effects-only loops are labeled by their actual media kind.project record · Reviewed 2026-11-05
  • Public website release verification ↗The approved M-OdiOS-inspired site and five Eidolon documentation pages passed public route and browser checks. The public gallery retains its media and correction labels.public check · Reviewed 2026-11-05

Milestone body-library · Reviewed 2026-11-05

UnderwayCurrent focus

Finish the remaining walk and anatomy review

The provisional mirrored side pair replaces the older walk, while hidden front tail links and rear gait remain open.Next stepReview clearer front anatomy and remaining rear gait while retaining the accepted mirrored side pair.Evidence, dependencies and acceptance checks

Delivered evidence

  • The user provisionally accepted the displayed W/E mirrored pair and four matching keys each.
  • Corrected directional keys and matching gallery loops replace the older walk exports with scope-specific labels.
  • The old containing montage is marked historical and hidden from the default current-motion view.

Still needed

  • Front-facing root/proximal tail links remain occluded and unverified.
  • Rear double-support gait and the wider anatomy audit remain provisional.
  • Closed or far-side hand digits and the canonical reference are not certified by the mirrored-pair acceptance.

Acceptance checks

  • Keep W/E acceptance explicitly provisional.
  • Do not certify a complete link or digit count when the relevant anatomy is hidden.
  • Further replacements receive their own visual review before labels are promoted.

Dependencies

Evidence reviewed

  • Provisional mirrored walk acceptance ↗The user accepted the displayed mirrored W/E pair and four matching keys each provisionally. This does not certify hidden front tail links, closed/far-side digits, the whole catalog or the canonical reference.user review · Reviewed 2026-11-05
  • Front-walk correction report ↗The earlier front three-toe issue prompted replacement studies. New front root/proximal tail links remain occluded and unverified; rear gait and the wider anatomy review remain open.user review · Reviewed 2026-11-05
  • Body review and publication handoff ↗Reference, pose keys, CRT details, timed holds, montages and effects-only loops are labeled by their actual media kind.project record · Reviewed 2026-11-05

Milestone body-toes · Reviewed 2026-11-05

Tested in isolationNext

Publish writing and image-creation reaction studies

Two delivered effects-loop prototypes need a distinct gallery entry beside their keys.Next stepVerify the delivered files and prepare a small separate gallery refresh.Evidence, dependencies and acceptance checks

Delivered evidence

  • Writing and image-creation effects-loop prototypes have been delivered.

Still needed

  • Verify the handoff and publish the loops beside the corresponding keys.

Acceptance checks

  • Both are labeled effects-loop prototypes.
  • Publication does not imply full body-action animation.

Dependencies

Evidence reviewed

  • Writing and image-creation loop handoffTwo additional effects-loop prototypes were delivered for a later gallery refresh. They have not been published in the current gallery.project record · Reviewed 2026-11-05

Milestone body-creative-effects · Reviewed 2026-11-05

FutureNext

Complete useful body-action cycles

Extend accepted poses into continuous actions where actual behavior needs them.Next stepPrioritize the actions required by the fresh-world acceptance sequence.Evidence, dependencies and acceptance checks

Delivered evidence

  • Idle, curious, walk, garden, work and interaction studies exist.

Still needed

  • Intermediate poses, transitions and complete action loops.
  • Perspective, registration and expression cleanup.

Acceptance checks

  • Each completed cycle is visually accepted at its intended display size.
  • Effects-only motion remains separately labeled.

Dependencies

Evidence reviewed

  • Body review and publication handoff ↗Reference, pose keys, CRT details, timed holds, montages and effects-only loops are labeled by their actual media kind.project record · Reviewed 2026-11-05

Milestone body-cycles · Reviewed 2026-11-05

UnderwayCurrent focus

Qualify the body in the connected scene

Use the accepted painted identity consistently in the fresh world.Next stepQualify the body presentation alongside the candidate scene; keep flagged walk frames identified.Evidence, dependencies and acceptance checks

Delivered evidence

  • Painted art has been integrated into isolated scene and action-rehearsal work.

Still needed

  • A verified body presentation in the paired world release.
  • Anchor, scale, direction and fallback checks with accepted assets.

Acceptance checks

  • No rejected rig reappears.
  • Actions use compatible poses and truthful animation status.

Dependencies

Evidence reviewed

  • Body review and publication handoff ↗Reference, pose keys, CRT details, timed holds, montages and effects-only loops are labeled by their actual media kind.project record · Reviewed 2026-11-05
  • Fresh campus and host-action rehearsal ↗Isolated visitor and scripted host-action checks are joined by real-model movement and gather/build trials plus restart continuity. Fresh paired deployment is still pending.isolated test · Reviewed 2026-11-05
  • Front-walk correction report ↗The earlier front three-toe issue prompted replacement studies. New front root/proximal tail links remain occluded and unverified; rear gait and the wider anatomy review remain open.user review · Reviewed 2026-11-05

Milestone body-runtime · Reviewed 2026-11-05

FutureLater

Develop Odi and Omie interactions

Build on accepted paintings and small reaction effects.Next stepChoose one accepted interaction for a complete sequence after core world actions.Evidence, dependencies and acceptance checks

Delivered evidence

  • Playful contact and stolen-seat reactions have effects-only studies.

Still needed

  • Complete body-action sequences where desired.
  • Continued character-reference and expression review.

Acceptance checks

  • Accepted character details survive each animation pass.
  • Held paintings and full sequences remain distinct.

Dependencies

Evidence reviewed

  • Body review and publication handoff ↗Reference, pose keys, CRT details, timed holds, montages and effects-only loops are labeled by their actual media kind.project record · Reviewed 2026-11-05

Milestone body-omie · Reviewed 2026-11-05

LiveCurrent focus

Review the approved three-key Rubber Duck study

The cleaned explain, listen and aha keys and their short loop are available in the gallery. This does not change Odi’s live avatar.Next stepUse the published study for review; qualify live-world use separately if requested.Evidence, dependencies and acceptance checks

Delivered evidence

  • User approval and completed edge cleanup are recorded in the handoff.
  • Three authored painted keys and a transparent short loop are linked beside the existing Rubber Duck entry.

Still needed

  • Keep the hidden bracing-thumb and painted pose/prop-drift limitations visible.

Acceptance checks

  • Three authored keys are distinguished from twenty rendered crossfade samples.
  • Playback begins only on request and stops immediately from the gallery control.
  • Mirror Peekaboo remains under review.

Dependencies

Evidence reviewed

  • Cleaned Rubber Duck approval and gallery handoff ↗The user approved the three painted Rubber Duck keys and displayed loop. The gallery-ready package confirms edge cleanup completed. Hidden bracing digits and painted prop drift remain explicit limitations.user review · Reviewed 2026-11-05

Milestone body-rubber-duck · Reviewed 2026-11-05

5 milestones

M-OdiOS

Native M-OdiOS is running. Camera, microphone and speaker hardware checks were confirmed by the user. Canonical chat receipts, vision interpretation and the fresh-world connection remain separate checks.

LiveCurrent focus

Run the native M-OdiOS interface

Keep the accepted interface stable while Odi’s launch takes priority.Next stepLimit changes to launch-critical support.Evidence, dependencies and acceptance checks

Delivered evidence

  • Native M-OdiOS is running with the approved visual direction.
  • Settings, themes and timers were preserved during retirement work.

Still needed

  • Essential integration support for the fresh introduction.

Acceptance checks

  • The working interface and chosen theme remain intact.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Native M-OdiOS and retirement reviewThe native interface runs with old-world polling and rendering removed. Obsolete visual previews are retired; this does not establish the new-world connection.installed check · Reviewed 2026-11-05

Milestone mirror-native · Reviewed 2026-11-05

Verified completeCurrent focus

Remove obsolete previews and old-world rendering

Retire duplicate visual previews and legacy world polling from the current interface.Next stepCarry this result forward in interface release reviews.Evidence, dependencies and acceptance checks

Delivered evidence

  • Old previews were retired.
  • Current M-OdiOS was checked for the absence of legacy world requests and renderer activity.

Still needed

  • Preserve the retirement requirement during recovery or later updates.

Acceptance checks

  • Future releases do not restore the old previews or automatic legacy-world navigation.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Native M-OdiOS and retirement reviewThe native interface runs with old-world polling and rendering removed. Obsolete visual previews are retired; this does not establish the new-world connection.installed check · Reviewed 2026-11-05

Milestone mirror-retirement · Reviewed 2026-11-05

Verified completeCurrent focus

Accept camera, microphone and speaker hardware

Record the physical checks already confirmed by the user.Next stepRetain the accepted settings; test other capabilities separately.Evidence, dependencies and acceptance checks

Delivered evidence

  • Camera capture, microphone recording and speaker playback were physically confirmed.

Still needed

  • Keep hardware acceptance distinct from vision interpretation and canonical chat.

Acceptance checks

  • Hardware results remain recorded without claiming unrelated end-to-end behavior.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Mirror hardware acceptanceCamera capture, microphone recording and speaker playback were physically confirmed. AI vision interpretation and canonical conversation receipts remain unverified.user review · Reviewed 2026-11-05

Milestone mirror-hardware · Reviewed 2026-11-05

FutureNext

Verify canonical chat receipts and AI vision

Complete the remaining end-to-end checks through the native interface.Next stepPerform the user-led checks when the selected conversation path is ready.Evidence, dependencies and acceptance checks

Delivered evidence

  • Physical media operation has user acceptance.

Still needed

  • A deliberate user conversation with the expected canonical receipt.
  • Separate evidence for AI interpretation of an intended image.

Acceptance checks

  • The actual conversation or interpretation outcome is inspected.
  • Hardware success alone is not counted as either result.

Dependencies

Evidence reviewed

  • Mirror hardware acceptanceCamera capture, microphone recording and speaker playback were physically confirmed. AI vision interpretation and canonical conversation receipts remain unverified.user review · Reviewed 2026-11-05
  • Native M-OdiOS and retirement reviewThe native interface runs with old-world polling and rendering removed. Obsolete visual previews are retired; this does not establish the new-world connection.installed check · Reviewed 2026-11-05

Milestone mirror-chat · Reviewed 2026-11-05

FutureLater

Resolve the duplicate theme selector

The upper selector issue is backlogged while the working bottom controls remain available.Next stepRevisit after Odi’s launch-critical work.Evidence, dependencies and acceptance checks

Delivered evidence

  • The bottom theme controls work and the selected theme was left unchanged.

Still needed

  • A small, separately reviewed consistency fix.

Acceptance checks

  • Both controls agree without resetting preferences.

Dependencies

Evidence reviewed

  • Mirror hardware acceptanceCamera capture, microphone recording and speaker playback were physically confirmed. AI vision interpretation and canonical conversation receipts remain unverified.user review · Reviewed 2026-11-05

Milestone mirror-theme · Reviewed 2026-11-05

4 milestones

Xenobiome Forge

The creative world-seed prototype has completed a real local-model trial. Human revision and a deliberate route into Odi’s tools and the Aetherwilde remain ahead.

Tested in isolationCurrent focus

Keep the world-seed creation workflow usable

Draft a world, biome, flora and fauna with connected ecological rules.Next stepPreserve the working prototype while revising the first real draft.Evidence, dependencies and acceptance checks

Delivered evidence

  • Editable imports, explicit creative review, separate local saving and export work in the prototype.

Still needed

  • A richer editor and further usability review.

Acceptance checks

  • A reviewed seed can be saved, reopened and exported.
  • Fictional mechanisms remain identified and internally consistent.
  • Deliberate fantasy is welcome; review considers the world’s own rules rather than demanding factual proof for invented biology.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Creative world-seed prototype and real trialOne actual local-model world draft imported successfully. Review found lighting, invented-energy and visual-detail issues. Live Odi registration and world adoption remain pending.isolated test · Reviewed 2026-11-05

Milestone forge-prototype · Reviewed 2026-11-05

Tested in isolationCurrent focus

Review the real local-model world draft

Use the completed trial as a starting draft with recorded limitations.Next stepRevise the preserved draft rather than repeatedly generating replacements.Evidence, dependencies and acceptance checks

Delivered evidence

  • One real request produced all four world-seed sections and imported successfully.

Still needed

  • Manual revision of lighting consistency, invented-energy limits and generic visual details.

Acceptance checks

  • The reviewed draft has coherent shared rules and useful design trade-offs.
  • One successful request is not treated as general quality evidence.

Dependencies

Evidence reviewed

  • Creative world-seed prototype and real trialOne actual local-model world draft imported successfully. Review found lighting, invented-energy and visual-detail issues. Live Odi registration and world adoption remain pending.isolated test · Reviewed 2026-11-05

Milestone forge-trial · Reviewed 2026-11-05

FutureNext

Register the Forge as a deliberate Odi tool

Make draft creation available through an explicitly invoked workflow.Next stepDefine the smallest deliberate request-and-review integration.Evidence, dependencies and acceptance checks

Delivered evidence

  • An on-demand model entry point exists separately from the browser prototype.

Still needed

  • Live Odi tool integration and a checked result handoff.

Acceptance checks

  • A requested draft produces an inspectable artifact and review status.
  • No generated draft is automatically adopted into the world.

Dependencies

Evidence reviewed

  • Creative world-seed prototype and real trialOne actual local-model world draft imported successfully. Review found lighting, invented-energy and visual-detail issues. Live Odi registration and world adoption remain pending.isolated test · Reviewed 2026-11-05

Milestone forge-odi · Reviewed 2026-11-05

FutureLater

Turn reviewed seeds into world material

Connect an accepted seed to terrain, organisms, rules and eventually playable places.Next stepDesign a small seed-to-world handoff after the local world and Forge tool are accepted.Evidence, dependencies and acceptance checks

Still needed

  • A mapping from reviewed text to approved assets and world rules.
  • A tested import and deliberate adoption step.

Acceptance checks

  • A generated seed is called playable only after a connected world has been checked.

Dependencies

Evidence reviewed

  • Creative world-seed prototype and real trialOne actual local-model world draft imported successfully. Review found lighting, invented-energy and visual-detail issues. Live Odi registration and world adoption remain pending.isolated test · Reviewed 2026-11-05
  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05

Milestone forge-worlds · Reviewed 2026-11-05

5 milestones

Website and documentation

The approved visual design, public art gallery and Eidolon documentation are live. This reviewed roadmap is the shared project record; private runtime data remains outside it.

LiveCurrent focus

Maintain the approved visual website and documentation

Keep the user-approved site stable and public material readable.Next stepUpdate the shared roadmap and relevant prose from reviewed evidence.Evidence, dependencies and acceptance checks

Delivered evidence

  • M-OdiOS-inspired styling and all five Eidolon documentation pages are live.
  • Public routes, mobile navigation, accessibility and gallery playback were checked.

Still needed

  • Substantive content upkeep as evidence changes.

Acceptance checks

  • The approved design is preserved.
  • Private records and operational details stay outside public writeups.

Dependencies

No prerequisite milestone is recorded.

Evidence reviewed

  • Public website release verification ↗The approved M-OdiOS-inspired site and five Eidolon documentation pages passed public route and browser checks. The public gallery retains its media and correction labels.public check · Reviewed 2026-11-05

Milestone site-public · Reviewed 2026-11-05

UnderwayCurrent focus

Review and maintain the shared roadmap

Keep one structured source aligned with new project evidence and reviewed decisions.Next stepReview new project evidence, update affected milestones and publish the next version together.Evidence, dependencies and acceptance checks

Delivered evidence

  • A cross-project audit distinguishes installed work, isolated tests, incomplete checks and future research.
  • A versioned source defines stable milestones, dependencies, evidence and next steps.

Still needed

  • Reconcile project updates before each published revision.
  • Keep the interactive roadmap and progress summary on the same source.

Acceptance checks

  • Public view and downloadable data agree.
  • Every milestone has a stable ID, status, dependencies, evidence and next step.
  • No dates or completion claims are invented.

Dependencies

Evidence reviewed

  • Public website release verification ↗The approved M-OdiOS-inspired site and five Eidolon documentation pages passed public route and browser checks. The public gallery retains its media and correction labels.public check · Reviewed 2026-11-05
  • Project charter and development planGoals for continuity, learning, creative work and an eventual fresh introduction. These describe intended direction, not completed capabilities.project plan · Reviewed 2026-11-05

Milestone site-roadmap · Reviewed 2026-11-05

FutureLater

Integrate the accepted curated world view

Present reviewed local-world information through the existing website.Next stepFollow the world-sync acceptance work rather than create a separate VPS world.Evidence, dependencies and acceptance checks

Delivered evidence

  • A public demonstration and offline integration prototype exist.

Still needed

  • The protected curated sync and truthful freshness states.

Acceptance checks

  • World authority remains on Odi’s computer.
  • No private raw state is exposed.

Dependencies

Evidence reviewed

  • Fresh-world integration handoffThe installed receiver rejects building footprints. A receiver fix is staged. The latest rest/goal-pause correction has scripted-only evidence; exact paired cutover remains pending.project record · Reviewed 2026-11-05
  • Public website release verification ↗The approved M-OdiOS-inspired site and five Eidolon documentation pages passed public route and browser checks. The public gallery retains its media and correction labels.public check · Reviewed 2026-11-05

Milestone site-sync · Reviewed 2026-11-05

How we maintain this together

Changes begin with an update to a milestone’s stable ID. We review the project evidence, record what changed, revise its status and next step, and check any dependent milestones. A new version is then published with a review date.

The shared JSON is the source for this view and the current-progress page. Download it to propose changes, or refer to a milestone ID in our discussion. A project name or passing test alone does not promote a milestone to live.

What each status means
Live
Installed or publicly available, with evidence for that stated scope.
Verified complete
A bounded task or acceptance check has finished; this does not imply a new running capability.
Tested in isolation
Evidence comes from a prototype, controlled trial or copied environment. Integration remains separate.
Underway
Implementation or qualification is in progress, with explicit remaining work.
Future
A planned direction with no claim of installed capability.
Decision needed
A human choice or acceptance remains open.
Revision history
  • 1.0.2 · 2026-11-05

    Added the approved, edge-cleaned Rubber Duck study beside its key and kept Mirror Peekaboo under review.

  • 1.0.1 · 2026-11-05

    Updated the walk handoff to provisional mirrored-pair acceptance, retained front-occlusion and rear-gait limitations, and kept the new Rubber Duck loop pending review.

  • 1.0.0 · 2026-11-05

    Replaced the static direction outline with a reconciled cross-project roadmap and one shared source.